NBN New Development Applications

Call Now

Streamline Your NBN Application with Expert Assistance for New Developments

We offer specialized services to assist with NBN new development application requests. Our team ensures that your development meets all necessary requirements for NBN connectivity, facilitating a smooth and efficient process from application to implementation.

Data Cabling Services 2

What is NBN New Development Application?

The NBN new development application is a process through which developers and property owners request the installation of NBN infrastructure in new residential or commercial developments. This includes coordinating with NBN Co and adhering to regulatory requirements to ensure that the new development is equipped with high-speed broadband connectivity.

Our NBN New Development Application Services

Application Preparation

We assist with preparing all necessary documentation and information required for submitting an NBN new development application.

Our Services Include:

  • Documentation Review: We review and prepare the required documentation, including site plans, development proposals, and connectivity requirements.
  • Application Form Completion: We complete the application forms on your behalf, ensuring all details are accurately filled out and comply with NBN Co requirements.
  • Coordination with NBN Co: We liaise with NBN Co to ensure that your application is processed efficiently, and any required approvals are obtained.

Benefits:

  • Accuracy and Compliance: Ensures that all documentation is complete and complies with NBN Co requirements, reducing the likelihood of delays.
  • Expert Guidance: Provides expert assistance in navigating the application process and meeting regulatory standards.
  • Streamlined Process: Simplifies the application process, saving you time and effort.
Site Assessment and Planning

We conduct a site assessment to determine the best approach for integrating NBN infrastructure into your new development.

Our Services Include:

  • Site Evaluation: We assess the site to determine the most suitable locations for NBN infrastructure, including pits, conduits, and network termination devices.
  • Planning and Design: We create a detailed plan for the installation of NBN infrastructure, ensuring it integrates seamlessly with your development layout.
  • Feasibility Study: We conduct a feasibility study to address any potential challenges and ensure that the NBN infrastructure can be efficiently implemented.

Benefits:

  • Optimal Planning: Ensures that NBN infrastructure is planned and integrated effectively into the development.
  • Future-Proofing: Helps in planning for future expansion or upgrades to the NBN infrastructure.
  • Reduced Delays: Identifies and addresses potential issues early, minimizing delays during installation.
Coordination and Implementation

We coordinate with NBN Co and other stakeholders to facilitate the implementation of NBN infrastructure in your development.

Our Services Include:

  • Project Management: We manage the project from application approval through to the installation of NBN infrastructure, ensuring timely and efficient completion.
  • Stakeholder Coordination: We coordinate with NBN Co, local authorities, and other relevant stakeholders to ensure smooth execution.
  • Installation Oversight: We oversee the installation process to ensure that it meets all specifications and standards.

Benefits:

  • Effective Management: Ensures that all aspects of the NBN installation are managed efficiently and effectively.
  • Seamless Integration: Facilitates smooth coordination between various parties involved in the installation process.
  • High-Quality Installation: Ensures that the NBN infrastructure is installed to the highest standards.
Post-Installation Support

We provide support following the installation of NBN infrastructure to ensure everything is functioning correctly and address any issues that may arise.

Our Services Include:

  • Inspection and Testing: We conduct thorough inspections and testing to verify that the NBN infrastructure is working as intended.
  • Issue Resolution: We address any issues or concerns that arise after installation, providing solutions to ensure continued performance.
  • Ongoing Support: We offer ongoing support to address any future needs or adjustments related to the NBN infrastructure.

Benefits:

  • Peace of Mind: Provides reassurance that the NBN infrastructure is functioning correctly and meets all requirements.
  • Quick Resolution: Ensures any post-installation issues are resolved promptly.
  • Long-Term Support: Offers continued support to address future needs or modifications.

Frequently Asked Questions

1. What is an NBN New Development Application?

An NBN New Development Application is the official request submitted to NBN Co to connect a new residential or commercial development to the National Broadband Network. It ensures your property is recognized and serviced as part of Australia’s broadband rollout.

2. Who needs to lodge an NBN application for a new development?

Builders, developers, owner-builders, and homeowners constructing a new property need to submit this application. It’s a mandatory step for obtaining NBN infrastructure like pits, pipes, and fibre cabling.

3. When should I apply for NBN in a new development?

You should submit your NBN application as early as possible—ideally during the planning or early construction stage. NBN recommends applying at least 3–6 months before the property is expected to be occupied to avoid delays.

4. What documents are required for a new NBN application?

Typically, you’ll need:

Site plans and lot layout

Council development approval

Certificate of Title or property ownership

Address confirmation (from council or Australia Post)
We help you prepare and submit all necessary documentation.

5. Is there a cost involved in new development applications?

Yes. NBN Co charges a New Development Contribution Fee, which is generally $300–$600, depending on the type and scale of development. We’ll help you understand any applicable charges upfront.

6. Can Value Services lodge the NBN application on my behalf?

Absolutely! We handle the entire NBN application process for you—preparing paperwork, submitting to NBN Co, and following up to ensure fast approval. Our team streamlines the process from start to finish.

7. How long does the application approval process take?

NBN approval typically takes 4 to 8 weeks, depending on complexity and location. Delays can occur if documents are missing or if the area lacks nearby NBN infrastructure. Our proactive approach helps prevent holdups.

8. What happens after my NBN application is approved?

Once approved, NBN Co will provide design and provisioning plans. From there, civil works such as trenching, conduit installation, and pit connections can begin—either by us or your builder under our guidance.

9. Do I need to install pit and pipe infrastructure before applying?

No, you apply first. Once approved, you’ll be issued NBN’s installation requirements (like trenching specs and conduit pathways), which must be followed during construction. We assist with both application and physical setup.

Scroll to Top